Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Permit Technician Exam Prep in Drawings: From Application to CO Code Lookups in 4 Steps, One Topic per Page

The permit route from application to CO, site and floor plans, square footage, code lookups, occupancy groups, stairs and guards, inspections and stop-work orders. Each topic has its own page: first the drawing, then what you need to remember. 65 illustrated pages.

GET THE ILLUSTRATED BOOK

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageThe code lookup drawn in 4 steps, with the explanation right beside it
65 illustrated pages8 parts, from why permits exist to your final exam checklist
Up-to-date sourcesBuilt on the Permit Technician exam content outline and the IBC and IRC editions it references
PDF by emailFormat

Look Inside the Book

Every page has one big drawing and a box with the numbers and steps you need to know:

Permit invalid after 180 days without start or 180 days suspended; extensions up to 180 days.
Permit invalid after 180 days without start or 180 days suspended; extensions up to 180 days.
12'-6" = 12.5 ft: divide the inches by 12 before any area math
12'-6" = 12.5 ft: divide the inches by 12 before any area math
A 24 ft × 30 ft garage = 720 sq ft; L-shapes split into rectangles
A 24 ft × 30 ft garage = 720 sq ft; L-shapes split into rectangles
Occupancy row → construction type column → letter footnote that changes the value.
Occupancy row → construction type column → letter footnote that changes the value.
A, B, E, F, H, I, M, R, S, U: the ten IBC occupancy groups, each with one icon.
A, B, E, F, H, I, M, R, S, U: the ten IBC occupancy groups, each with one icon.
Smoke: each bedroom, outside sleeping areas, every story. CO: fuel appliance or attached garage.
Smoke: each bedroom, outside sleeping areas, every story. CO: fuel appliance or attached garage.
Owner or contractor requests each inspection and gives access (Sections 110.1 and 110.5).
Owner or contractor requests each inspection and gives access (Sections 110.1 and 110.5).
180 days · 120 and 200 sq ft · 7 ft · 30 in · 7¾ in · 5.7 sq ft · 50 occupants.
180 days · 120 and 200 sq ft · 7 ft · 30 in · 7¾ in · 5.7 sq ft · 50 occupants.

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 8 parts and 61 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're at the counter with a floor plan for an L-shaped addition, and the applicant asks how many square feet go on the permit. You need one number, and the line behind them keeps growing.

You did study it. But the manual covers area in a long paragraph about gross floor area, exterior walls and projections, with no drawing that shows you where to cut the shape.

A 24 ft × 30 ft garage = 720 sq ft; L-shapes split into rectangles

In the book, square footage is one page: a 24 ft × 30 ft garage drawn with its sides, 720 sq ft in a box, and the L-shape split into two rectangles you simply add together.

The same goes for the site plan, the 180-day permit clock, the 10 occupancy groups, the stair rules and the inspection timeline: each one has its own page.

You see the shape, split it, add it up and write the number on the application, without opening the manual again.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Study It

THIS
  • The manual: line after line after line
  • Setbacks and easements explained only in words
  • You get to the counter still unsure
The site plan shall depict the lot in its entirety, including all property lines with their dimensions and bearings, the location of existing structures to remain and of those proposed to be constructed, and the required yard distances measured perpendicular from each lot line to the nearest projection of the structure. Recorded easements, whether for utilities, drainage or access, shall be indicated with their width and purpose, and no permanent structure shall encroach upon such areas unless otherwise authorized by the easement holder and the jurisdiction.
FOR THIS
  • The site plan in one drawing
  • Lot lines, setbacks and easements in a labeled box
  • You see it and you get it
12'-6" = 12.5 ft: divide the inches by 12 before any area math
CONTENTS

Take a Look at the 8 Parts and 61 Topics

How a permit office works, the permit journey stop by stop, reading plans, code lookups in 4 steps, occupancy and construction type, residential questions, inspections and the CO, and exam day: 65 pages, all illustrated.

IHow a Permit Office Works · pp. 5-11
  1. Why Permits Exist
  2. Model Code vs. Adopted Code
  3. The Family of Codes on One Shelf
  4. Zoning Is Not the Building Code
  5. Who Does What in the Building Department
  6. Your Job at the Counter
  7. Legal Basics You Need to Know
IIThe Permit Journey, Stop by Stop · pp. 12-20
  1. The Route Map: Application to CO
  2. Does This Job Need a Permit?
  3. Emergency and Ordinary Repairs
  4. What a Complete Application Includes
  5. Construction Documents: What to Ask For
  6. Valuation and How Fees Are Set
  7. Plan Review in One Picture
  8. Corrections and Resubmittals
  9. Issuing the Permit and the 180-Day Clock
IIIReading Plans in Feet and Inches · pp. 21-28
  1. The Plan Set in Order
  2. Scales Without Panic
  3. Reading Dimensions: 12'-6"
  4. The Site Plan
  5. The Floor Plan
  6. Symbols and Abbreviations
  7. Elevations and Sections
  8. Square Footage Math for the Counter
IVCode Lookups in 4 Steps · pp. 29-35
  1. How a Code Book Is Built
  2. Step 1: Start at the Index
  3. Step 2: Confirm the Chapter
  4. Step 3: Read the Section and Its Exceptions
  5. Step 4: Read the Table Correctly
  6. Definitions Change the Answer
  7. Tabbing and Highlighting Your Book
VOccupancy and Construction Type · pp. 36-43
  1. The 10 Occupancy Groups on One Page
  2. Assembly: A-1 to A-5
  3. Business, Mercantile and Educational
  4. Residential: R-1 to R-4
  5. Institutional, Factory, Storage and Utility
  6. Mixed Use and Change of Occupancy
  7. The 5 Construction Types
  8. Height and Area in Three Tables
VIResidential Questions at the Counter · pp. 44-50
  1. When the IRC Applies
  2. Decks, Additions and Garages
  3. Stairs, Guards and Handrails
  4. Emergency Escape Openings
  5. Smoke and CO Alarms
  6. Room Sizes and Ceiling Heights
  7. Trade Permits: Who Pulls What
VIIInspections, Corrections and the CO · pp. 51-59
  1. The Inspection Timeline
  2. Scheduling and Access
  3. Approved, Partial or Failed
  4. Special Inspections
  5. Stop-Work Orders
  6. Violations and Unsafe Structures
  7. Certificate of Occupancy
  8. Appeals, Modifications and Alternatives
  9. Records Retention and Closing a Permit
VIIIReview and Exam Day · pp. 60-65
  1. The Exam Content Outline, Mapped
  2. Pacing the Exam
  3. Reading the Question Before the Book
  4. The Numbers to Have at Hand
  5. Most Frequent Counter and Exam Mistakes
  6. Your Final Checklist

One Page, One Topic, All Clear

Think of it this way:

A contractor calls about a permit he pulled last spring and never started. He wants to know, right now, if it's still good.

You open the page on issuing the permit and see the 180-day clock drawn: no start in 180 days, or work suspended for 180 days, and the permit is no longer valid, with the extension rule right beside it and a reminder to check your local amendments.

A, B, E, F, H, I, M, R, S, U: the ten IBC occupancy groups, each with one icon.

Same with the site plan, square footage, the code table in 4 steps, the occupancy groups and the inspection timeline: each one on its own page.

Permit Technician Illustrated is 8 parts and 61 topics, all drawn, and it ends with the numbers to have at hand and your final checklist.

What you see drawn, you don't have to memorize.

What's Inside Permit Technician Illustrated:

Ipp. 5-11

How a Permit Office Works

Why permits exist, model code vs. adopted code, the family of codes, zoning vs. building code, who does what in the department and your job at the counter.

IIpp. 12-20

The Permit Journey, Stop by Stop

The route from application to CO, stop by stop: you know when a permit is needed, what makes an application complete, how plan review and corrections work and when the 180-day clock runs out.

IIIpp. 21-28

Reading Plans in Feet and Inches

The plan set in order, scales, dimensions like 12'-6", the site plan, the floor plan, symbols, elevations and sections, and square footage math.

IVpp. 29-35

Code Lookups in 4 Steps

Code lookups always in the same 4 steps (index, chapter, section with its exceptions, table): you stop flipping pages and land on the right section, with definitions and tabs to find it faster.

Vpp. 36-43

Occupancy and Construction Type

The 10 occupancy groups, assembly to utility, mixed use and change of occupancy, the 5 construction types and height and area.

VIpp. 44-50

Residential Questions at the Counter

When the residential code applies, decks and additions, stairs and guards, escape openings, smoke and CO alarms, room sizes and trade permits.

VIIpp. 51-59

Inspections, Corrections and the CO

The inspection timeline, scheduling, approved or failed, special inspections, stop-work orders, violations, the CO, appeals and closing a permit.

VIIIpp. 60-65

Review and Exam Day

The content outline mapped, pacing the exam, reading the question first, the numbers to have at hand, the most frequent mistakes and your final checklist.

At the end of the book: The numbers to have at hand on one page, the most frequent counter and exam mistakes, and a final checklist.

Plus: 2 Free Books

Permit Tech Practice Questions

BONUS 1: «Permit Tech Practice Questions»

Value on its own: US$ 17.90

Exam-style questions with the answer and the page to look it up, so you practice finding the section in time, not just reading it.

15 Permit Counter Mistakes, Fixed

BONUS 2: «15 Permit Counter Mistakes, Fixed»

Value on its own: US$ 14.90

The most frequent mistakes at the counter and on the exam, each drawn before and after, so you review them at a glance before test day.

Permit Technician Illustrated with 2 Free Books

  • Permit Technician Illustrated: 65 illustrated pagesUS$ 63
  • BONUS 1: Permit Tech Practice QuestionsUS$ 17.90
  • BONUS 2: 15 Permit Counter Mistakes, FixedUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT PERMIT TECHNICIAN ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Permit Technician Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're new to the permit counter

You're new to the permit counter

You came from another office and don't have the full map yet. Here you see a permit from application to CO as a route with stops.

The Permit Technician exam is close

The Permit Technician exam is close

You study after work with the code book on the kitchen table. Each topic is one drawn page, and code lookups always follow the same 4 steps.

You already work the counter

You already work the counter

Contractors ask fast. You keep the site plan, the stair numbers and the 180-day clock printed and at hand.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT PERMIT TECHNICIAN ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Permit Technician Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I already work at a permit counter?

Yes. It goes straight to what you use every day: plans, square footage, code lookups, occupancy, inspections. What your code book and notes don't give you: each topic drawn on one page, and the same 4 lookup steps every time. If you already know a topic, you review it in one page and move on.

Where does the content come from?

From the Permit Technician exam content outline and the IBC and IRC editions it references. The book follows the model code. Your jurisdiction may have adopted another edition or local amendments (permit time limits, for example), so check the editions listed in your exam bulletin and your local code before you rely on a number.

Is this official material?

No. It's an independent study book, not affiliated with or endorsed by the International Code Council. It doesn't reproduce the code text or tables.

Does it replace a prep course or on-the-job training?

No. It's a study aid that helps you understand and review. It doesn't give you a certificate, CEUs or exam credit. Your code book, your training and your building official still come first.

Are the practice questions the ones on the exam?

No. They're written for this book, in exam style, to practice finding the right section in time.

When and how do I get it?

In PDF, by email, at the address you enter at checkout. The 2 bonus books come with it.

Do I have to pay every month?

No. It's a one-time payment.

Can I have it on paper?

Yes. The PDF is ready to print, so you can tab it, mark it and keep it on your desk. It's a study aid, not an exam reference: check your exam bulletin for which references you can use during the exam, and use this book to learn where things are in your own code book.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading the code book with nothing sticking.

The site plan, the stair numbers, the 180-day clock: you see them drawn, and that's it.

You get to the exam and the counter knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT PERMIT TECHNICIAN ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.